SCL

SCL

Underground side-loading container designed to operate with a low-pressure hydraulic circuit, offering greater durability.

Available inlets

Technical characteristics of the inlets available for the underground side-loading container.

Milenium

Material

HDPE and steel

Height

1110 mm

Single drum capacity

80 L

Double drum capacity

80 L

Special access options

Available for glass, packaging and paper

Europa

Material

HDPE and steel

Height

1100 mm

Single drum capacity

80 L

Double drum capacity

80 L

Special access options

Available for glass, packaging and paper

Evolution

Material

Stainless steel and galvanised steel

Height

952 mm

Single drum capacity

80/100/120 L

Double drum capacity

80/100/120 L

Special access options

Available for glass, packaging and paper

Kheops

Material

Stainless steel / galvanised steel

Height

950 mm

Single bin capacity

Accepts bags up to 120 L

Double drum capacity

80/120 L

Special access options

Available for glass, packaging and paper

Minim

Material

Stainless steel / galvanised steel

Height

1001 mm

Single drum capacity

No limit

Double drum capacity

No limit

Special access options

Available for glass, packaging and paper

The advantages of choosing SCL

Maximum volume in each installation

Allows integration of containers of up to 3,500 litres per unit and configurations of 1 or 2 containers, optimising collection capacity in a reduced surface area.

Optimised hydraulic performance

Lifting system using single-acting hydraulic cylinders and an autonomous control unit, enabling fast, precise and reliable operation with standard times of 15 seconds.

Safe operation for equipment and operators

It incorporates safety valves, locking systems and reinforced structures that ensure controlled and safe operation during use and maintenance.

Versatility in configuration and collection

Available in single and double configurations, and compatible with different types of inlets and waste fractions, adapting to multiple collection needs.

Efficient installation and reduced costs

Designed to minimise civil engineering works and optimise installation, it reduces implementation times and offers a longer service life with controlled maintenance.

WOULD YOU LIKE MORE INFORMATION?

Complete the form and we will get in touch to provide you with all the details.